Dongguan Compensation System Design Consulting — Piece-Rate + Staff Pay in One Frame

Chang'an mold plant — line workers paid well, supervisors say pay unfair. Electronics, hardware, 3C: piece-rate is not outside the rules.

Dongguan / Compensation

Chang’an mold plant — line income not low, supervisors: “we carry the load, pay unfair.” Line by piece, staff by year — two logics fight — typical in Dongguan electronics, hardware, mold, 3C clusters.

Dongguan compensation design puts point lines and staff 3P in one Cubic Compensation frame — 3B base/bonus/benefits by level; piece-rate is not a lawless zone — must reconcile at operations review.

Dongguan industry context

Rollout points

  1. Role/headcount — job value clear, then pay table
  2. Point KPI — process-split, measurable output (packaging, injection, CNC)
  3. Cup KPI for managers — plant head / workshop lead own line P&L and delivery
  4. 3B tuning — line bonus ties quality/delivery, not volume alone
  5. Trial — one line + one staff block, 8 weeks

Case reference principle

Published cases mainly Shenzhen/Foshan (optoelectronics, metals, etc.). Dongguan projects use same piece-manufacturing methodology on-site — selection: ask piece + staff dual-track timeline, do not force wrong-city names.

One question for Dongguan owners

“Piece workers, team leads, staff managers — one rule set or three tables?” Three tables — argument eventually.

Related: piece-rate retention (founder) · factory retention · Dongguan hub


Liu Xinzhen · NDU MSc · ICMC-certified consultant | XieChunQiu · Shenzhen

20+ years · 600+ clients · 200+ listed companies · 80%+ repeat or referral