Dongguan / Compensation
Chang’an mold plant — line income not low, supervisors: “we carry the load, pay unfair.” Line by piece, staff by year — two logics fight — typical in Dongguan electronics, hardware, mold, 3C clusters.
Dongguan compensation design puts point lines and staff 3P in one Cubic Compensation frame — 3B base/bonus/benefits by level; piece-rate is not a lawless zone — must reconcile at operations review.
Dongguan industry context
- Electronics / 3C: multi-shift, piece + hourly, seasonal spikes
- Hardware / molds: skill tiers, piece price vs quality hard to link
- Common: high floor share — 1% pay error = large cost
Rollout points
- Role/headcount — job value clear, then pay table
- Point KPI — process-split, measurable output (packaging, injection, CNC)
- Cup KPI for managers — plant head / workshop lead own line P&L and delivery
- 3B tuning — line bonus ties quality/delivery, not volume alone
- Trial — one line + one staff block, 8 weeks
Case reference principle
Published cases mainly Shenzhen/Foshan (optoelectronics, metals, etc.). Dongguan projects use same piece-manufacturing methodology on-site — selection: ask piece + staff dual-track timeline, do not force wrong-city names.
One question for Dongguan owners
“Piece workers, team leads, staff managers — one rule set or three tables?” Three tables — argument eventually.
Related: piece-rate retention (founder) · factory retention · Dongguan hub
Liu Xinzhen · NDU MSc · ICMC-certified consultant | XieChunQiu · Shenzhen
20+ years · 600+ clients · 200+ listed companies · 80%+ repeat or referral